1MW Natural Gas Generator for the Verizon Hotel

Triad CEI provided the MEP and civil engineering to install a full building emergency generator with advanced relaying for future demand reduction or peak energy shaving:


  • Paralleling switchboard with draw-out circuit breakers to provide closed transition transfers in less than 100ms,

  • Storm avoidance capabilities to transfer in anticipation of a utility power outage,

  • Integration of load shedding with Siemens BAS system,

  • Upgrade of existing natural gas header and pressure reducing valves to maintain pressure to building,

  • Zoning, construction and NJ Department of Environmental Protection (DEP) permitting support.