1MW Natural Gas Generator for the Verizon Hotel

Triad CEI provided the MEP and civil engineering to install a full building emergency generator with advanced relaying for future demand reduction or peak energy shaving:


  • Paralleling switchboard with draw-out circuit breakers to provide closed transition transfers in less than 100ms,

  • Storm avoidance capabilities to transfer in anticipation of a utility power outage,

  • Integration of load shedding with Siemens BAS system,

  • Upgrade of existing natural gas header and pressure reducing valves to maintain pressure to building,

  • Zoning, construction and NJ Department of Environmental Protection (DEP) permitting support. 



CONTACT

TRIAD CONSULTING

ENGINEERS, INC.

Professional Engineering Company

MEP Engineering

Power Engineering

Solar Power Energy Farms

HVAC Engineering

Arc Flash Study Work

OUR ADDRESS

North American Headquarters

2740 Route 10 West, Morris Plains, NJ 07950
Tel:  973.984.1919

For any general inquiries, please fill in the following contact form:

CONTACT US

© 2020 Triad Consulting Engineers, Inc. Website Design by JKI Marketing