Triad CEI provided the MEP and civil engineering to install a full building emergency generator with advanced relaying for future demand reduction or peak energy shaving:
Paralleling switchboard with draw-out circuit breakers to provide closed transition transfers in less than 100ms,
Storm avoidance capabilities to transfer in anticipation of a utility power outage,
Integration of load shedding with Siemens BAS system,
Upgrade of existing natural gas header and pressure reducing valves to maintain pressure to building,
Zoning, construction and NJ Department of Environmental Protection (DEP) permitting support.