Flemington, NJ – 1.95MW(AC)/2.5MW(DC) Ground Mount PV System




Triad performed the project interconnection and design engineering, then was engaged to build this solar PV system in just a few months.  In order to meet this deadline, Gavan Graham Electrical Products fabricated inverter switch racks to minimize field wiring and expedite the project timeline. 

This project is a direct grid connect, 15kV interconnection, which utilized directional boring to minimize impact on wetlands.  The system is comprised of 7,800 Trina Solar modules and 65 Huawei Technologies inverters, five (5) Gavan Graham switch racks and one (1) 3000A, 480V AC collector switchboard. 

CONTACT

TRIAD CONSULTING

ENGINEERS, INC.

Professional Engineering Company

MEP Engineering

Power Engineering

Solar Power Energy Farms

HVAC Engineering

Arc Flash Study Work

OUR ADDRESS

North American Headquarters

2740 Route 10 West, Morris Plains, NJ 07950
Tel:  973.984.1919

For any general inquiries, please fill in the following contact form:

CONTACT US

© 2020 Triad Consulting Engineers, Inc. Website Design by JKI Marketing