Earth Satellite Station – Connecticut – New Generator with Remote Fuel Supply System

Updated: Mar 4, 2020

After performing a site audit and inspection, an upgrade strategy was developed based upon congested site restrictions and equipment condition. 


Project design was developed to minimize service outages as the new generator and the associated fuel supply system were installed.  


Detailed cutover plans involved precise coordination with network operation centers (NOC’s) and timely services switch-overs during the critical installation phases.