Electrical Engineering to Design-Build a 35kV Generator Interconnection Substation

Updated: Aug 2, 2018

Electrical engineering to design and install this custom substation to provide reliable service and maximize uptime for this distributed generation (DG) facility. 



  • A utility remote terminal unit (RTU) for metering data and control was built into the lineup in a dedicated section.

  • Substation equipped with custom SCADA for monitoring generation, troubleshooting alarms and control.

  • Dedicated SCADA switchgear section pre-wired and tested at factory to facilitate the installation for remote communications.

  • Advanced relay settings were incorporated to mitigate arc flash hazards and reduce incident energy.

  • Remote operator panel for breaker control reduces exposures to increase workplace safety.

  • Dual UPS backup provides redundancy for system control power and facilitates maintenance.




CONTACT

TRIAD CONSULTING

ENGINEERS, INC.

Professional Engineering Company

MEP Engineering

Power Engineering

Solar Power Energy Farms

HVAC Engineering

Arc Flash Study Work

OUR ADDRESS

North American Headquarters

2740 Route 10 West, Morris Plains, NJ 07950
Tel:  973.984.1919

For any general inquiries, please fill in the following contact form:

© 2020 Triad Consulting Engineers, Inc.

Website Design by JKI Marketing